CONSTRUCTION HOURS:
  • Tuesday, September 23, 2014 – Friday, September 27, 2014: 3am – 3pm / 3pm – 3am (West, East, & North Blocks) / 7am – 11.30pm (N2 Block) 
CONSTRUCTION ACTIVITIES:
  • Vertical and Slab Pours (All Blocks) / as needed
  • Structural Steel Erection (All Blocks)
  • Excavation and Trucking ( All Blocks) 
  • Security and Monitoring (All Blocks / everyday)
CLOSURES:
  • Monday – Friday / 9.30am – 3.30pm / as needed
    • Single lane closure: South Miami Avenue, between 7th and 6th Streets
    • Single/Double Lane closure: SW/SE 8th Street
  • Sunday – Thursday / 9pm – 5.30am / as needed
    • Double Lane Closure: SE 7th Street & SW/SE 8th Street
  • Saturday & Sunday / 6am – 4pm / as needed
    • Double Lane Closure: SW 7th Street
    • Double Lane Closure: SE/SW 8th Street
LANE & SIDEWALK CLOSURES:
  • South Miami Avenue (East Lane) from SE 8th Street to SE 6th Street
  • SE/SW 7th Street, SE/SW 8th Street,  SE 6th Street, and South Miami Avenue.