CONSTRUCTION HOURS:
  • Saturday, January 24, 2015 – Sunday, January 25, 2015: 3am – 3pm/3pm – 3am (East) / 6am – 9pm (North and West)
  • Monday, January 26, 2015: 3am – 3om/3am – 3pm (all blocks)

CONSTRUCTION ACTIVITIES:

  • Vertical and Slab Pours (All Blocks) / as needed
  • Structural Steel Erection (All Blocks)
  • Excavation and Trucking ( All Blocks) 
  • Security and Monitoring (All Blocks / everyday)
CLOSURES:
  • Saturday, January 24, 2015: full closure – SE 7th Street between Brickell and South Miami Avenues
  • Monday – Friday / 9.30am – 3.30pm / as needed
    • Single lane closure: South Miami Avenue, between 7th and 6th Streets
    • Single/Double Lane closure: SW/SE 8th Street
  • Sunday – Thursday / 9pm – 5.30am / as needed
    • Double Lane Closure: SE 7th Street & SW/SE 8th Street
  • Saturday & Sunday / 6am – 4pm / as needed
    • Single/Double Lane Closure: SW/SE 7th Street
    • Single/Double Lane Closure: SE/SW 8th Street
TEMPORARY CLOSURES (Roads, Lanes, and Sidewalks):
  • Lanes: South Miami Avenue (east lane) / SE/SW 8th Street (north lane) / SE/SW 7th Street (south lane) 
  • Sidewalks: SW 7th Street, SE/SW 8th Street, SE 5th Street, and South Miami Avenue.
  • Road: SE 6th Street (between South Miami Avenue & SE 1st Avenue)
PLEASE NOTE THE MAP DOES NOT REFLECT ALL CLOSURES. REFER TO THE ABOVE DESCRIPTIONS FOR UP-TO-DATE CLOSURES.