CONSTRUCTION HOURS:
  • Monday, April, 14, 2014 – Friday, April 18, 2014: 3am – pm / 3pm – 3am (all blocks)
CONSTRUCTION ACTIVITIES:
  • Vertical and Slab Pours (All Blocks) / as needed
  • Excavation and Trucking ( All Blocks)
LANE & SIDEWALK CLOSURES:
  • Thursday, April 17, 2014 / 9pm – 5.30am
    • Single Lane Closure: SE 6th Street

Monday – Friday / 9.30am – 3.30pm / as needed

  • Single lane closure: South Miami Avenue, between 7th and 6th Streets / as needed
  • Single/Double Lane closure: SW/SE 8th Street
Temporary Lane Closures
  • South Miami Avenue (East Lane) from SE 8th Street to SE 6th Street

Temporary Sidewalk Closures

  • SE/SW 7th Street, SE/SW 8th Street, ¬†SE 6th Street, and South Miami Avenue.