CONSTRUCTION HOURS:
  • Friday, November 21, 2014: 12am – 8pm (North) / 3am – 12am (East & West) / 7am – 6pm (N2)
  • Saturday, November 22, 2014: 6am – 7pm (North) / 12am – 3pm/3pm – 12am (East) / 12am – 10pm (West) / 7am – 6pm (N2)
  • Sunday, November 23, 2014: 6am – 6pm (North) / 12am – 6.30pm (East) / 6am – 6pm (West) / No work (N2)
  • Monday, November 24, 2014: 3am – 3pm/3pm – 3am (North, East, & West) / 7am – 6pm (N2)
CONSTRUCTION ACTIVITIES:
  • Vertical and Slab Pours (All Blocks) / as needed
  • Structural Steel Erection (All Blocks)
  • Excavation and Trucking ( All Blocks) 
  • Security and Monitoring (All Blocks / everyday)
CLOSURES:
  • 4am, Saturday, November 22, 2014 – 5am, Monday, November 24, 2014
    • Full closure: SE 7th Street
  • Monday – Friday / 9.30am – 3.30pm / as needed
    • Single lane closure: South Miami Avenue, between 7th and 6th Streets
    • Single/Double Lane closure: SW/SE 8th Street
  • Sunday – Thursday / 9pm – 5.30am / as needed
    • Double Lane Closure: SE 7th Street & SW/SE 8th Street
  • Saturday & Sunday / 6am – 4pm / as needed
    • Single/Double Lane Closure: SW/SE 7th Street
    • Single/Double Lane Closure: SE/SW 8th Street
TEMPORARY CLOSURES (Roads, Lanes, and Sidewalks):
  • Lanes: South Miami Avenue (east lane) / SE/SW 8th Street (north lane) / SE/SW 7th Street (south lane) 
  • Sidewalks: SW 7th Street, SE/SW 8th Street, SE 5th Street, and South Miami Avenue.
  • Road: SE 6th Street (between South Miami Avenue & SE 1st Avenue)
PLEASE NOTE THE MAP DOES NOT REFLECT ALL CLOSURES. REFER TO THE ABOVE DESCRIPTIONS FOR UP-TO-DATE CLOSURES.